tag:blogger.com,1999:blog-326167780677397310.post4981983974638345918..comments2024-03-27T21:35:04.988-07:00Comments on EGO OUT: DAILY SHARED LENR DISCOVERIES, December 9, 2014Georgina Popescuhttp://www.blogger.com/profile/04628821029016016988noreply@blogger.comBlogger2125tag:blogger.com,1999:blog-326167780677397310.post-10056222396300005852014-12-09T19:06:02.194-08:002014-12-09T19:06:02.194-08:00A child needs both conditional love (generally fro...A child needs both conditional love (generally from the mother) and conditional love (generally from the father). Abd advocates the former and Peter the latter. Balanced growth requires both.amulehttps://www.blogger.com/profile/06861841219981349646noreply@blogger.comtag:blogger.com,1999:blog-326167780677397310.post-20791680815067159322014-12-09T11:54:40.270-08:002014-12-09T11:54:40.270-08:00Rossi has publicly stated that he is using over 1...Rossi has publicly stated that he is using over 100 computers to implement his latest control stratagem. From this meager bit of information we can deduce fairly much what is going on with the 1 megawatt cluster E-Cat reactor. That number of computers means he is using a SCADA system to do the command and control function to keep his creation in line.<br /><br />The term SCADA (supervisory control and data acquisition) usually refers to a centralized system which monitors and controls the industrial infrastructure of entire sites, or complexes of systems spread out over large areas (anything from an industrial plant to a nation). Most localized control actions are performed automatically by Remote Terminal Unit (RTU)s or by Programmable Logic Controller (PLC)s. These are computer boards which are controlled by a low level microcomputer usually housed in a rack mounted enclosure using a full duplex bus structure to communicate with a master control station(MCS). The MCS is a custom coded PC that hosts the bus network and provides a graphical user interface to depict the operational parameters and status of all the E-Cats. In a high availability application, the MCD runs in a ghosted mode with a hot backup PC.<br /><br />The cost of such a system is substantial. This digital Command and Control(C&C) will comprise a large fraction of the cost of Rossi's 1 megawatt plant. Such a system is prone to bugs, out of profile behavior and hacking attacks. Usually industrial customers will want to integrate the E-Cat cluster reactor into their factory wide SCADA C&C system.<br /><br />In my opinion, Rossi and Industrial heat have made a mistake in judgment on this reactor design decision. A simplified fail safe analog based control system is best suited to the 1 MW E-Cat cluster reactor.<br /><br /> <br />Axilhttps://www.blogger.com/profile/07190120527431077518noreply@blogger.com